The life cycle of a sports facility is structured into twelve stages, from identifying initial needs to its use, evaluation, and continuous adaptation.
Once the conception phase has been analyzed—which allows determining the need for the intervention, defining the type of facility, and assessing its feasibility—the process moves on to the phases of programming and materializationThe programming phase specifies what the equipment should be like and how it can be made a reality. It includes three stages:
• Stage 4. Specific implementation of the spaces program.
• Stage 5. Equipment design.
• Stage 6. Financing of construction and management.
The implementation phase transforms planning into concrete action and is also structured into three stages:
• Stage 7. Construction
• Stage 8. Reception
• Stage 9. Management resources.
These phases are crucial to ensure that the facility meets the identified needs, complies with criteria for functionality, safety, accessibility, and sustainability, and has the necessary resources to begin management under appropriate conditions. The document The following outlines the six stages that constitute the programming and materialization phases of a sports facility.